justin00v6
06-30-2003, 08:07 PM
i'm almost there, only a day or two left
i've had the headers and downpipe bolted up for a while now...with only the exhaust housings installed
today i installed the P side compressor and center section, both drain lines are made and hooked up
tomorrow i'm going to make the oil feed lines
i made a bracket for the D side turbo, tomorrow i will make one for the p side turbo
both wastegate actuators are on
once i get it running i need to drive around and empty the tank of that old gas, then its time for some fun
i've had the headers and downpipe bolted up for a while now...with only the exhaust housings installed
today i installed the P side compressor and center section, both drain lines are made and hooked up
tomorrow i'm going to make the oil feed lines
i made a bracket for the D side turbo, tomorrow i will make one for the p side turbo
both wastegate actuators are on
once i get it running i need to drive around and empty the tank of that old gas, then its time for some fun